Check out the November meeting displays here.

Alternative 1: "Loop" alternative with 10 foot shared path for pedestrians and cyclists.

Alternative 3: Alternative with 10 foot shared path for pedestrians and cyclists.
Please note, Alternative 2 was eliminated upon further examination and is not included for consideration at this time.

What the area looks like without the new crossing.

An artistic drawing of what alternative 1 would look like if built.

An artistic drawing of what alternative 3 would look like if built.


